Your resource for web content, online publishing
and the distribution of digital products.
«  
  »
S M T W T F S
 
 
 
 
 
 
1
 
2
 
3
 
4
 
5
 
6
 
7
 
8
 
9
 
 
 
 
 
 
 
 
 
 
 
 
21
 
22
 
23
 
24
 
25
 
26
 
27
 
28
 
29
 
30
 
31
 
 
 
 
 
 

What Makes AI Work? A Breakdown of the Key Proofs

DATE POSTED:January 16, 2025

:::info Authors:

(1) Jongmin Lee, Department of Mathematical Science, Seoul National University;

(2) Ernest K. Ryu, Department of Mathematical Science, Seoul National University and Interdisciplinary Program in Artificial Intelligence, Seoul National University.

:::

Abstract and 1 Introduction

1.1 Notations and preliminaries

1.2 Prior works

2 Anchored Value Iteration

2.1 Accelerated rate for Bellman consistency operator

2.2 Accelerated rate for Bellman optimality opera

3 Convergence when y=1

4 Complexity lower bound

5 Approximate Anchored Value Iteration

6 Gauss–Seidel Anchored Value Iteration

7 Conclusion, Acknowledgments and Disclosure of Funding and References

A Preliminaries

B Omitted proofs in Section 2

C Omitted proofs in Section 3

D Omitted proofs in Section 4

E Omitted proofs in Section 5

F Omitted proofs in Section 6

G Broader Impacts

H Limitations

E Omitted proofs in Section 5

First, we prove following key lemma.

\

\

\ and let U¯ be the entire right hand side of inequality. Then, we have

\

\ Now, we prove second inequality in Lemma 17 by induction.

\ If k= 1,

\

\ and let U¯ be the entire right hand side of inequality. Then, we have

\

\ Now, we prove the first rate in Theorem 6.

\

\ Now, for the second rate in Theorem 6, we present following key lemma.

\

\

\

\ let U¯ be the entire right hand side of inequality. Then, we have

\

\ Now, we prove the second rate in Theorem 6.

\

\

:::info This paper is available on arxiv under CC BY 4.0 DEED license.

:::

\